WARD REMODELLING @ WARWICK HOSPITAL

Client: Warwick Hospital
Location: Warwick

DHA Architects have assisted the South Warwickshire NHS Foundation Trust on 2 projects at this Hospital. 

The first was the re-design of existing ward areas to create a new kitchenette, administration and meeting roomswithin the Dugdale and Avon Suites on Charlcote Suite Squire Ward. These works were carefully phased to minimize the disruption caused to the live ward. In conjunction with this, the design works took into account the efficiency of work being carried out simultaneously to help keep control of costs.

The second was the improvement of their existing kitchen facilities in order to upgrade and re-model to ensure services could be delivered effectively and safely throughout the day. The works were designed closely with the professional catering team to ensure systems could be phased with limited disruption to the food service. The existing M&E services need to be renewed and included new power supplies to the hot trolleys, freezer and fridge units. The kitchen area was further divided to create separate areas for dishwash facilities.



Return to Project List